Solutions / Engineering
Catch the mismatch before the drawing is issued.
Every P&ID, datasheet and calculation pre-checked against owner standards, country-specific regulations and the rest of the document set, with a live view of document health across the project.
For EPC contractors and asset owners in energy, petrochemicals and utilities
- Design pressure matches datasheetT-201: P&ID 40 bar, datasheet 25 barFLAG
- Tag exists in the line listLine 6"-P-1042 not in the listFLAG
- Material selection for serviceDeviation may be acceptable, needs engineerREVIEW
- Instrument index consistent46 of 46 tags matchedPASS
- Referenced revisions are current12 references checkedPASS
- Mandatory fields completeTitle block and notes presentPASS
The messy reality
Tens of thousands of documents. Two or three review cycles each.
- A large plant project runs to 20,000 to 50,000 documents.
- Senior engineers act as spell-checkers for stale references and mismatched units.
- Repeat review cycles delay the schedule and trigger liquidated damages.
What we check
Every line. Every rule. Every time.
- Tags consistent across P&ID, line list and instrument index
- Design pressure and temperature within spec limits
- Materials consistent with the guideline
- Mandatory sections and fields present
- Document numbers and revision references valid
- Units and formats as specified
- Symbols follow the legend
The always-on layer
One change. Every affected document, the same day.
Each revision of a P&ID, line list or datasheet re-runs the checks against the current set, so a change that breaks another document is caught immediately.
FLAGP&ID Rev C raised T-201 to 40 bar. Datasheet still says 25 bar. Caught the same day.
What changes for you
From checking to deciding.
Accuracy is measured, never claimed
Start with 200 reviewed documents.
Share 200 documents with their owner comments under NDA. We will show you what we would have caught before issue.
Start with a proof